Controller
Your Leading Controller Supplier
Zhejiang Lishiba Pump Co., Ltd. is a national high-tech enterprise integrating research and development, production, sales and service. The company's controllers include single-phase intelligent controller and three-phase intelligent controller for submersible pumps. Controllers are devices or software that regulate, manage, or control a process or system to achieve a desired outcome or maintain a specific state. They are used in various applications, including computer systems, industrial processes, and even gaming.
Why choose us
Rich Experience
"LISHIBA" brand was founded in 1999. The company specializes in the production and sales of deep well submersible motors, deep well submersible pumps, stainless steel fountain pumps, vertical multi-stage centrifugal pumps, and intelligent silent pumps.
Complete Qualifications
The company has obtained multiple certifications such as IS09001:2015, CCC, CE, and has been honored with titles such as "National High tech Enterprise", "Zhejiang Province Science and Technology Enterprise", and "Patent Demonstration Enterprise" .
Professional Team
We have a professional sales and technical team to provide comprehensive professional technical support and excellent marketing services to our customers.
Production Market
Our company's products are exported to more than 30 countries and regions including Europe, America, the Middle East, Africa, and Southeast Asia. Our domestic sales cover more than 30 provinces, cities, and autonomous regions across the country.
Types of Controller
Single-Phase Intelligent Controller
Single-phase pump controllers are primarily used when the pump is turned on and off multiple times during the day. The primary reason for using a single-phase pump controller is to control and minimize or prevent damage to the pump while enabling unattended and efficient pump operation.
Three-Phase Intelligent Controller for Submersible Pumps
The Three Phase controller takes a major leap forward in fixed speed Submersible Turbine Pump (STP) control. Built upon the fixed speed Single Phase Controller platform, three phase fixed speed pump controllers feature an enhanced user interface, greater functionality, and higher performance compared to standard control boxes.

Specifications of Controller
|
Rated Output Power |
0.37KW-2.2KW (0.5HP-3HP) |
Rated Input Voltage |
AC220V/50HZ Single Phase |
|
Trip Response Time Of Over Load |
5sec-5min |
Trip Response Time Of Short Circuit |
<0.1sec |
|
Trip Response Time Of Under / Over Voltage |
<5sec |
Trip Response Time Of Dry Run |
6sec |
|
Recovery Time Of Over Load |
30min |
Recovery Time Of Under / Over Voltage |
5min |
|
Recovery Time Of Dry Run |
30min |
Trip Voltage Of Over Voltage |
253V |
|
Trip Voltage Of Under Voltage |
175V |
Functions of Controller
Real-Time Monitoring
Track energy consumption instantly, helping identify high-usage appliances.
Remote Access
Check usage data from anywhere via Wi-Fi, Bluetooth, or GSM.
Prepaid & Postpaid Options
Supports both billing models for flexibility.
Tamper Detection
Alerts users or utilities in case of unauthorized interference.
Load Management
Helps prevent overloads by monitoring power demand.
Data Logging
Stores historical usage for better analysis and cost-saving decisions.
Installation Steps of Controller

1. Turn off the line power to the existing meter. If this is not possible, then ensure that safety precautions are taken to prevent electric shock.
2. Remove the terminal cover from the existing meter.
3. Remove the line and load wires from the existing meter terminals. Make sure you label the wires or have a method to identify the line and load wires of phase L1 and neutral for proper installation in the new meter.
4. Remove the old meter.
5. Install the NES meter in the same location as the previous meter, using mounting hardware that is appropriate for the type of surface material.
6. Inspect the line and load wires to make sure they are not damaged or frayed.
7. Connect the line and load wires to the meter terminals, being careful to use the correct phase, neutral, and line/load configuration.
8. Turn the supply line power to the meter on.
9. Test each phase line terminal of the meter to make sure power is on to each phase, and that the neutrals are connected to the proper terminals.
10. Turn on the load disconnect contactor by pressing the load disconnect push button. The load disconnect push button can be configured to operate in one of several different modes.
11. Test the load terminals of the meter to make sure power is available to each phase of the load.
12. Check the display for proper operation of the meter. See the "Correct Meter Operation Verification Table" below for more information.
13. Replace the terminal cover. Apply a seal to the sealing screw if necessary or desired. The installation is complete.
Ordering Process
Send Us Inquiry → Receive Our Quotation → Negotiate Details → Confirm the Sample → Sign Contract/Deposit → Mass Production →Cargo Ready → Balance/Delivery → Further Cooperation
Certificate





Other Services
Delivery Commitment
- Maintain an on-time delivery rate of 99%.
- Small orders are delivered within 15 days, large orders within 35 days.
Payment Methods
- T/T: 30% Advanced Payment, Balance Payment Against The Copy Of B/L.
- 100% LC At Sight.
Transportation

FAQ






